Bimeq® GLUE

Bituminous polistyren foam glue

Technical data
Basis asphalt, latex, upgrading additives
Consumption per 1 layer (without dilution) 1- 1,2 kg/m2 - waterproofing
1- 1,4 kg/m2 - gluiyng
Application temperature from +5°C to +30°C
Drying up time (1mm of wet layer) max. 6 hours; full resistance after 7 days
Number of layers 1-3 depending on the application
Storage above +5°C
Shelf life 12 months after the day of production
Packages plastic or metal containers, 5kg, 10kg and 20kg, drums 200kg
Application

Mix Bimeq® GLUE thoroughly prior to application. Use Bimeq® PRIMER R (asphalt priming solution) or Bimeq® PRIMER W1 (bituminous emulsion) diluted with water.

Waterproofing: Apply the mass onto a primed surface in 2-3 layers. It can be applied manually using a trowel.

Gluing of insulation boards: Place 6-8 dabs per board. Push the board on firmly. The adhesive layer should not be more than 2 mm thick.

Specification

The product should be applied in dry conditions with an ambient and surface temperature between +5°C and +30°C. The binding time depends on the temperature (at 20°C, the binding process is complete after 24h) and the movement of air masses.

In order to reduce the risk of damage to the insulated surface e.g. when backfilling the excavation or moving the soil, wait until the layers are completely dry and use special draining boards or other securing elements. Do not use the product inside rooms intended for permanent residence of people and animals and in areas used by the food industry. Do not use in direct contact with tar-based products or polystyrene.The product contains organic solvents. During product application, follow health and safety guidelines and wear protective clothing. Use the product in well-ventilated areas, away from fire. Keep out of the reach of children.

  

Work should be done according to the Occupational and Health Safety rules resulting from the material safety data sheets (MSDS) and package labelling.