Bimeq® PRIMER R EXPRESS

Solvent-based bitumen primer

Technical data
Basis asphalt mixtures, solvent, upgrading additives
Consumption per 1 layer 0,4 – 0,5 l/m2 (depending on the type of the base)
Application temperature from +5°C to +30°C
Drying-up time up to 2 hour (23°C)
Number of layers 1-3 depending on the application
Shelf life 12 months after the production date
Packages plastic or metal containers 10L and 20L, drums 200L
Application

Mix the product thoroughly prior to application. It can be applied with a brush or roller. It can also be applied using a spray gun.

Specification

The product should be applied in dry conditions with an ambient and surface temperature between +5°C and +30°C. The binding time depends on temperature (at 23°C, the drying time is approximately 2 hours and the binding process is complete after 12h) and the movement of air masses.

In order to reduce the risk of damage to the isolated surface e.g. when backfilling the excavation or moving the soil, wait until the layers are completely dry and use special draining boards or other securing elements. Do not use the product inside rooms intended for permanent residence of people and animals and in areas used by the food industry. Do not use in direct contact with tar-based products or polystyrene. The product contains organic solvents. During product application, follow health and safety guidelines and wear protective clothing. Use the product in well-ventilated areas. Apply the product according to the best construction practices, manufacturer’s instructions, standards and the relevant occupational health and safety regulations.

  

Work should be done according to the Occupational and Health Safety rules resulting from the material safety data sheets (MSDS) and package labelling.