Bimeq® PRIMER W1

Water-based bitumen primer

Technical data
Base asphalt, latex, water, upgrading additives
Application temperature from +5°C to +30°C
Drying up time (1mm of wet layer) max. 6 hours (air temperature 20°C, relative air humidity 65%)
Method of application brush, roofwork brush, spray-up
Density ca. 1,0 kg/dm3
Storage above +5°C
Shelf life 12 months after the date of production
Packages plastic containers 5kg, 10kg and 20kg, drums 200kg
Application

Mix the product thoroughly prior to application. It can be applied with a brush or roller. It can also be applied using a spray gun.

Specification

Work should be done under dry conditions at air and base temperature from +5°C to +30°C and at foreseen lack of precipitation during bounding. The bounding time depends on the air temperature and relative air humidity (for relative humidity at the level of 65% and air temperature at ca. 20 °C, the proper coating will dry up for maximum 6 hours). The temperature rise and air humidity drop influence on shortening the bounding time. The temperature drop and humidity increase may elongate the bounding time several times.

To avoid damaging the insulated surface e.g. during backfilling or land sliding, it is necessary to wait until the insulation complete drying occurs and to apply proper draining boards or other shields.

  

Work should be done according to the Occupational and Health Safety rules resulting from the material safety data sheets (MSDS) and package labelling.